Category: Highway Alert
Type: Current Affairs
Date and time: 21/01/19
Location: Middle Ramu

(This is my report): First lot of materials have arrived on Friday,18/01/2019 in Aiome for the construction of road works. 15m allocated for Baiyer-Madang Road.

The Papua New Guinea Defence Force engineering battalion is determined to complete phase two of the Western Highway along Baiyer-Madang from Aiom in Middle Ramu to link Jimi River.

The soldiers loaded their construction machines and equipment, including an excavator, a bulldozer, two dump trucks, two four-wheel drives and two banana boats on mv Sulu Express in Lae for the road construction. The shipment cost K400,000.

RK

Contact Form URL: https://sms511madwatch.wordpress.com/incident-reporting-form16/

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.